Cloud Migration Architecture Diagram: On-Prem to AWS

How to draw a cloud migration architecture diagram for on-prem to AWS: current state, transition, target, replication and cutover, plus a review checklist.

cloud migration architecture diagramUpdated 11/22/2026Shafi Khan

Cloud Migration Architecture Diagram: On-Prem to AWS

A cloud migration architecture diagram is not one diagram. It is three: where you are today (on-prem), where you are going (AWS), and the messy middle where both are live and data is flowing between them. Most teams draw the first and the last, skip the middle, and then wonder why cutover weekend turns into a group chat full of question marks.

This guide walks through how to draw an on-premises to AWS migration architecture diagram that a reviewer can actually sign off: what goes in each view, how to show replication and cutover, which AWS facts to get right, and a checklist to run before the migration review.

Why your cloud migration architecture diagram needs three views

The classic migration deck has a "before" slide with a rack of servers and an "after" slide with tidy AWS icons. Nice. Also useless for the hard questions:

  • During wave 2, which database is the source of truth?
  • What traffic crosses the data center link while half the estate has moved?
  • If the cutover fails at 2 a.m., what do you roll back to, and how?

Those answers live in the transition state, so give it a first-class view.

ViewWhat it answersMust show
Current stateWhat exists and how it talksServers, databases, network zones, external dependencies, IP ranges
Transition stateHow we move without breaking thingsHybrid link, replication paths, staging resources, source of truth per system, rollback path
Target stateWhat we are building on AWSAccounts, VPCs, subnets, managed services, security boundaries

Keep the same layout and naming across all three. When the "payments-db" box lives top right in every view, reviewers can spot what changed in seconds instead of playing spot-the-difference.

→ Generate a first-pass target state from a prompt with Architect AI

Step 1: Map the current on-prem state honestly

The current-state view is where the diagram nobody updated since 2023 gets exposed. Do not draw it from memory. Pull it from evidence: CMDB exports, firewall rules, load balancer configs, DNS zones, and the folks who get paged when things break.

What to capture:

  • Workloads and their dependencies. Not just "app server talks to DB". Include the cron job that FTPs a file to a partner every night. That is the dependency that breaks first.
  • Network zones and CIDR ranges. Write the actual ranges on the diagram. You will need them when you design the AWS VPCs, because overlapping ranges cannot be routed cleanly across a hybrid link.
  • Data stores with size and change rate. A 50 GB database that barely changes and a busy OLTP database with heavy writes need very different migration paths.
  • Hard constraints. Licensing tied to hardware, appliances that cannot be virtualised, data that must stay in a specific location.

If you want a structured way to run discovery, the current-state mapping guide breaks it down by system type.

→ Plan non-overlapping VPC ranges with the free CIDR Subnet Calculator

Step 2: Label every workload with a migration strategy (the 7 Rs)

Before you draw a single arrow into AWS, tag each box with its strategy. AWS Prescriptive Guidance defines seven migration strategies, known as the 7 Rs:

StrategyAlso calledWhat it meansHow to show it on the diagram
RetireDecommission or archive the applicationGrey it out in the current state, absent from target
RetainKeep it in the source environment for nowStays on-prem in target view, with its hybrid dependency drawn
RehostLift and shiftMove without changing the applicationSame shape, new home (for example EC2)
RelocateMove to a cloud version of the platform, or to another VPC, Region or accountPlatform-level move, call out the platform
RepurchaseDrop and shopReplace with a different version or productSwap the box for the SaaS or product, note data migration
ReplatformLift, tinker, and shiftMove with some optimisationFor example self-managed DB to a managed database service
Refactor or re-architectChange the architecture to use cloud-native featuresNew shape entirely, usually its own diagram

Two practical notes. First, the same guidance says refactoring is not recommended for large migrations, and that rehost, replatform, relocate and retire are the common strategies there. Translation: if half your boxes say "refactor", your migration plan is secretly a rewrite. Second, "Retain" boxes are the sneaky ones. Every retained system that talks to a migrated system means permanent traffic over your hybrid link, so draw that arrow and size it.

→ Compare target options before you commit with Cost Estimator

Step 3: Draw the transition state (the part everyone skips)

This is the money view of any on-premises to AWS migration architecture. It shows how data and traffic move while both worlds are live.

Show the connection between the data center and AWS explicitly. Per the Amazon VPC documentation, an AWS Site-to-Site VPN is an IPsec connection between your VPC and your remote network, and the virtual private gateway or transit gateway provides two VPN endpoints (tunnels) for automatic failover. You configure a customer gateway device on your side. The same page notes Direct Connect can be combined with Site-to-Site VPN for an IPsec-encrypted connection.

On the diagram, label:

  • Link type (VPN, Direct Connect, or both)
  • Where it terminates on AWS (virtual private gateway or transit gateway)
  • Both tunnels, not a single line, so nobody assumes there is no redundancy story
  • The CIDR ranges routed in each direction

The hybrid connectivity guide covers the trade-offs between the options in more depth.

Server replication paths

For rehosted servers, AWS's tooling is documented today as AWS Transform MGN (you will still see "application-migration-service" in some AWS links). It performs continuous block-level replication: an AWS Replication Agent on each source server replicates to lightweight replication servers that MGN launches in a staging area subnet. Test and cutover instances launch in a separate operational subnet.

The MGN network requirements are exactly the kind of detail a diagram should carry, because they become firewall tickets:

On-prem source servers ──TCP 1500──▶ Replication servers (staging area subnet)
On-prem source servers ──TCP 443───▶ MGN API endpoint
Replication servers    ──TCP 443───▶ MGN API endpoint
Staging area subnet    ─────────────▶ Regional EC2 endpoint + Amazon S3
Cutover instances      live in the operational subnet (from the launch template)

AWS recommends a new dedicated subnet for the staging area and notes that SSL interception should not be applied on the path to the MGN API endpoint. If your corporate proxy inspects TLS by default, put that on the diagram as a risk now, not on cutover night.

Database replication paths

Databases usually get their own path. With AWS Database Migration Service, you show three things: the replication instance, the source endpoint and the target endpoint. Then label the task type:

  • Full load plus CDC: migrates existing data, then applies ongoing changes from the source.
  • CDC only: applies ongoing changes once data already exists on the target.

One line worth putting in the diagram notes: AWS's own docs say DMS CDC does not provide real-time replication and there are no SLAs for CDC latency. So the cutover runbook needs a "wait for lag to drain" step, and the diagram should make clear which side is writable at each point. Our database migration checklist covers the cutover and rollback sequence.

Source of truth and rollback

Add a small legend per system: source of truth = on-prem / AWS, and the date or wave when it flips. Then draw the rollback path as a dashed arrow. If you cannot draw how you would roll back, you do not have a rollback plan, you have a vibe.

→ Set realistic recovery targets with the free RTO/RPO Calculator

Step 4: Draw the target AWS state

The target view is closest to a normal AWS architecture diagram, with a few migration-specific additions:

  • Account and VPC boundaries. Show which accounts the migrated workloads land in, and keep the VPC CIDRs you planned in step 1 visible.
  • Subnet tiers. Public, private application, private data. Keep the MGN staging area subnet separate from the operational subnets, and mark it as temporary.
  • Managed service swaps. Where you replatformed, show the new managed service and keep a small note of what it replaced.
  • Retained dependencies. Anything still on-prem stays on the diagram, connected through the hybrid link.
  • Security boundaries. Security groups, IAM boundaries and encryption points for data in transit and at rest.

If you want a refresher on what a reviewable AWS diagram looks like, the AWS architecture diagram guide walks from requirements to cost, security and scalability review.

→ Track every version of the design with Architecture Diff

On-prem to AWS migration diagram review checklist

Run this before the migration review board, not after.

Current state

  • Every workload in scope appears, including batch jobs and partner integrations
  • CIDR ranges are written on the diagram
  • Data stores show size and approximate change rate

Strategy

  • Every workload is labelled with one of the 7 Rs
  • Every Retain box has its hybrid dependencies drawn
  • Refactor items are scoped as separate projects, not hidden in a wave

Transition

  • Hybrid link type, termination point and both tunnels are shown
  • Replication flows are drawn separately from user traffic, with ports
  • Source of truth is marked per system, per wave
  • A rollback path exists for every cutover

Target

  • Account, VPC and subnet boundaries are clear
  • Staging resources are marked temporary
  • Cost is estimated for the target state, with prices dated

For the broader design review, pair this with the AWS Well-Architected review checklist.

→ Build a reusable review checklist with the free Architecture Review Checklist Builder

Common migration diagram mistakes

A few patterns that show up again and again:

  1. One arrow labelled "migration". Servers, databases and file shares move with different tools at different speeds. One arrow hides all of that.
  2. No IP plan. The target VPC reuses 10.0.0.0/16 because that is what the template had, and it overlaps with the data center. Now routing across the hybrid link is a problem.
  3. Forgetting the temporary stuff. Staging subnets and replication instances cost money and need security review too. Show them, then show them gone.
  4. Target state drawn as a wish list. If the team has never run Kubernetes, the target diagram probably should not be 40 microservices on EKS for wave 1.
  5. Diagrams frozen after the kickoff. By wave 3 the real topology has drifted from the slide. Version the diagram per wave so reviewers see what actually changed.

→ See what actually exists across accounts and regions with Cloud Inventory

Key takeaways

  • A cloud migration architecture diagram is three views: current, transition and target. The transition view carries most of the risk.
  • Label every workload with its 7 Rs strategy so reviewers understand why it moves the way it does.
  • Draw replication as its own flow with tools and ports. For MGN that means TCP 1500 to the staging area subnet and TCP 443 to the service API.
  • Mark the source of truth per system and draw a rollback path for every cutover.
  • DMS CDC is not real-time, so plan for lag in the cutover sequence.
  • Plan CIDR ranges early and keep the diagram versioned per wave.

→ Compare diagram tools for migration work: Architecto vs Cloudcraft

FAQ

What should a cloud migration architecture diagram include?

At minimum three views: the current on-premises state, the transition state where both environments run side by side, and the target AWS state. The transition view is the one most teams skip and the one that matters most, because it shows the hybrid network link, the replication paths for servers and databases, which system is the source of truth during each wave, and the rollback path.

What are the 7 Rs of cloud migration?

AWS Prescriptive Guidance lists seven migration strategies: retire, retain, rehost (lift and shift), relocate, repurchase (drop and shop), replatform (lift, tinker, and shift) and refactor or re-architect. Labelling each workload on the diagram with its strategy tells reviewers why it is moving the way it is.

How do you show replication on an on-prem to AWS migration diagram?

Draw replication as its own flow, separate from user traffic, and label the tool, direction and port. For servers rehosted with AWS Transform MGN, the source servers send replicated data to replication servers in a staging area subnet over TCP 1500 and talk to the service API over TCP 443. For databases moved with AWS DMS, show the replication instance between the source and target endpoints and note whether the task is full load plus CDC or CDC only.

Should the migration diagram show the hybrid network connection?

Yes. The link between the data center and AWS carries both the migration data and any traffic between systems that have moved and systems that have not. Show whether it is a Site-to-Site VPN, AWS Direct Connect or both, where it terminates (virtual private gateway or transit gateway) and which CIDR ranges are routed across it, because overlapping IP ranges are a classic migration blocker.

→ Turn your migration requirements into a diagram with Architect AI

Start your migration diagram today

Migrations rarely fail because of a single AWS service choice. They fail on the gaps between views: the dependency nobody drew, the replication lag nobody planned for, the rollback path nobody tested. Draw all three states, keep them versioned, and make the transition view the star of the review.

Describe your current estate and target in plain English, get an editable diagram, then refine it with your team and estimate the target cost before the first wave.

→ Start free with Architecto

FAQ

Questions readers ask before they act on this page.

What should a cloud migration architecture diagram include?

At minimum three views: the current on-premises state, the transition state where both environments run side by side, and the target AWS state. The transition view is the one most teams skip and the one that matters most, because it shows the hybrid network link, the replication paths for servers and databases, which system is the source of truth during each wave, and the rollback path.

What are the 7 Rs of cloud migration?

AWS Prescriptive Guidance lists seven migration strategies: retire, retain, rehost (lift and shift), relocate, repurchase (drop and shop), replatform (lift, tinker, and shift) and refactor or re-architect. Labelling each workload on the diagram with its strategy tells reviewers why it is moving the way it is.

How do you show replication on an on-prem to AWS migration diagram?

Draw replication as its own flow, separate from user traffic, and label the tool, direction and port. For servers rehosted with AWS Transform MGN, the source servers send replicated data to replication servers in a staging area subnet over TCP 1500 and talk to the service API over TCP 443. For databases moved with AWS DMS, show the replication instance between the source and target endpoints and note whether the task is full load plus CDC or CDC only.

Should the migration diagram show the hybrid network connection?

Yes. The link between the data center and AWS carries both the migration data and any traffic between systems that have moved and systems that have not. Show whether it is a Site-to-Site VPN, AWS Direct Connect or both, where it terminates (virtual private gateway or transit gateway) and which CIDR ranges are routed across it, because overlapping IP ranges are a classic migration blocker.